Close Menu
Newsfilter.infoNewsfilter.info
    Facebook X (Twitter) Instagram
    Newsfilter.infoNewsfilter.info
    • Home
    • Business
    • Lifestyle
    • News
    • Technology
    • Digital Marketing
    • Health
    • Fashion
    • Social Media
    • Education
    Newsfilter.infoNewsfilter.info
    Home»Home Improvement»The division of the house construction period
    Home Improvement

    The division of the house construction period

    Jaxson MorrisonBy Jaxson MorrisonAugust 14, 2022No Comments6 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The installment payment for the construction of a house will be in the case of hiring a contractor only for wages.

    Note : We are a house building company. We have been a well-known company in the home building business for a long time. We have more than 5000 houses built in Thailand. find more information on our website : https://www.trendyhome.co.th/

    1st installment: steel frame work completed and rust proofing completed ————————pay 30%

    2nd installment of the main roofing work completed (excluding roof terrace)

    Interior floor paneling, interior walls completed. and the electric wires are completed ————————- Pay 20%

    3rd installment: exterior wall paneling – exterior ceiling paneling completed——————————Pay 20%

    4th installment: bathroom tile work – sanitary ware installation All internal ceilings-

    All doors and windows – roof terrace completed.

    Exterior and interior paint work 90% completed —————————————— Pay 20%

    Part 5. The fourth job is 100% complete. Clean and remove all scraps.

    Completed, connect the water pipes, treatment system, connect the electrical mains and test the electrical system

    Tested the bathroom and equipment and completed —————————–Pay 10%

    **In case of large work, high work value, can be paid in more than 5 installments

    *** In the case of hiring a contractor only for wages : The contractor may request an advance payment of 2,000-3,000 baht for fuel.

    to bring tools to work with us

    Example of contractor pay

    In the case of contractor wages, 3,000 baht per sq m., the house has a size of 3x5 m. = 15 sq.m. 3,000 x 15 = 45,000 baht.

    In the case of hiring a contractor only for wages

    1st installment: steel frame work completed and rust proofing completed———-pay 30% (13,500g)

    2nd installment of the main roofing work completed (excluding roof terrace)

    Interior floor paneling, interior walls completed. And the electric wires are completed ————- Pay 20% (9,000g)

    3rd installment: exterior wall paneling – exterior ceiling paneling completed —————-Pay 20% (9,0008)

    Installment 4. Bathroom tile work Install sanitary ware – all internal ceilings –

    All doors and windows – roof terrace completed.

    Exterior and interior paint work 90% completed —————————————— Pay 20% (9,0008)

    Part 5. Paint work is 100% complete, clean and remove all scraps.

    Completed, connect the water pipes, treatment system, connect the electrical mains and test the electrical system

    Testing the bathroom and equipment and done ——————————————Pay 10 % (4,500g)

    1. Construction of the construction period Fiber cement steel frame house, no more than 36 sq m.

    In the case of building a  house or a moving knock-down house

    1st installment: sign a contract, receive a deposit, complete 30%

    The 2nd installment of the steel frame work is completed and rust proofing is completed ———————— Collect 40%

    3rd installment: ceiling, floor, wall, roof work

     Bathroom tile work (except grout work), sanitary ware, electrical system

     All doors and windows Paint work is 90% complete.

     ready to transport —————————————————- ———Keep 20%

         (*** 3rd installment, collect money before shipping to customers or when the car arrives at the land, collect money before installation)

    4th installment of the house, collecting paint work, 100 % complete

     Connect water pipes, treatment systems, connect electrical mains and test the electrical system.

     Test the bathroom and equipment.

     Clean and collect all scraps and finish ——————Collect 10%

    **In case of large work, high work value, should be divided into more than 4 installments.

    *** Viewing the area in front of the event is important. to the difficulty of transportation It is a preliminary assessment that

    Can the house be transported in, or do I have to build it on site?

    Example of collecting installments for building a knock-down house, moving type

    In case of selling a house, 13,000 baht per sq m. The house has a size of 3x5 m. = 15 sq.m. 13,000 x 15 = 195,000 baht.

    In the case of building a moving knock-down house

    1st installment: contract and complete—————————————— ———————- Save 30% (58,500฿)

    The 2nd installment of the steel frame work is completed and rust proofing is completed ——————————- Collect 40% ( 78,000฿)

    3rd installment: ceiling, floor, wall, roof work

     Bathroom tile work (except grout work), sanitary ware, electrical system

     All doors and windows Paint work is 90% complete.

     Ready to transport and install———————————————- ——————— Collect 20% (39,000฿)

      (*** 3rd installment, collect money before shipping to customers or when the car arrives at the land, collect money before installation)

    4th installment of the house, collecting paint work, 100 % complete

     Connect water pipes, treatment systems, connect electrical mains and test electrical systems

     Test the bathroom and equipment

     Cleaning and collecting all scrap materials and finished ————————- Collect 10% (19,500฿)

    **In case of large work, high work value, should be divided into more than 4 installments.

    1. Construction of the construction period Fiber cement steel frame house, no more than 36 sq m.

    In the case of building a knock-down house on the customer’s land

    1st installment: contract and complete—————————————— —————————-Keep 30%

    2nd installment: steel frame work completed and rust proofing is completed ———————————– -Keep 30%

    3rd installment: the main roofing work is completed (excluding the balcony roof)

    Interior floor paneling, interior walls completed. and the electric wires are completed

    Exterior wall paneling – exterior ceiling paneling completed—————————————- ———————Keep 20%

    4th installment of the balcony roof work completed bathroom tile work

    Install sanitary ware – all interior ceilings

    All doors and windows are finished———————————————- ——————————- Collect 15%

    5th installment of the paint job completed Clean and remove all debris.

    Completed, connect the water pipes, treatment system, connect the electrical mains and test the electrical system

    Test the bathroom and equipment and completed———————————————— ————Keep 5%

    **In case of large work, high work value, can be Collecting more than 5 periods

    Example of collecting installments for building a knock-down house on the customer’s land

    In the case of building a house, 13,000 baht per sq m. The house has a size of 3x5 m. = 15 sq.m. 13,000 x 15 = 195,000 baht.

    In the case of building a knock-down house on the customer’s land

    1st installment: contract and complete—————————————— ———————- Save 30% (58,500฿)

    2nd installment: steel frame work completed and rust proofing completed ——————————- 30% collected ( 58,500฿)

    3rd installment: the main roofing work is completed, excluding the roof terrace)

    Interior floor paneling, interior walls completed. and the electric wires are completed

    Exterior wall paneling – exterior ceiling paneling completed—————————————- ——Save 20% (39,000฿)

    4th installment of the balcony roof work completed bathroom tile work

    install sanitary ware all internal ceilings

    All doors and windows are finished———————————————- —————– Save 15% (29,250฿)

    5th installment of the paint job completed Clean and remove all debris.

    After completion, connect the water pipes, treatment system, and connect the electrical mains.

    and test the electrical system Test the bathroom and equipment Completed —————————- Collect 5% (9,750฿)

    **In case of large work, high work value, can be divided into more than 5 installments

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Jaxson Morrison
    • Website

    Related Posts

    Convenient Healthcare Services at Aurelle of Tampines EC Your One-Stop Destination for Quality Medical Care in Tampines

    January 7, 2025

    Maximizing Efficiency with Scottsdale AZ HOA Management

    June 3, 2024

    Garage Door Repair in Vancouver, Washington: Expert Solutions for a Secure Home

    December 7, 2023
    Latest Post

    Practical Ways To Improve Coding Accuracy in High-Stakes Environments

    August 22, 2025

    Why Businesses Choose Two Way Radio Rentals

    August 22, 2025

    Why Consecutive Interpretation Might Be All You Need

    May 26, 2025

    Pro-Level Gaming: How the Sihoo Doro C300 Pro Boosts Your Gameplay

    May 19, 2025
    Categories
    • Home
    • Business
    • Lifestyle
    • News
    • Technology
    • Digital Marketing
    • Health
    • Fashion
    • Social Media
    • Education
    • Contact us
    • Privacy Policy
    Newsfilter.info © 2026, All Rights Reserved

    Type above and press Enter to search. Press Esc to cancel.